Free Template · Risk & Assessment

AI Risk Register Template Every AI Risk Scored and Owned

A working AI risk register for security, risk, and compliance teams. The spreadsheet ships with 30 pre-loaded AI risks across eight categories, 5-point likelihood and impact scoring, automatic inherent and residual ratings, and dropdowns for category and status. Delete what does not apply, add what does, and you have a living register.

What's inside the register

Three worksheets, built so your team can start scoring risks the same day.

1

Instructions

How to use the register, step by step: tailoring the pre-loaded risks, scoring, naming owners, and keeping the register current.

  • •Setup and tailoring steps
  • •Scoring at a glance
  • •Review cadence guidance
2

Risk Register

The working sheet. 14 columns from risk ID to next review date, with formulas that calculate inherent and residual scores as you type.

  • •30 pre-loaded risks with controls
  • •Dropdowns for category, ratings, and status
  • •Color-coded scores: green, amber, red
  • •Frozen header and filters, ready to sort
3

Scoring Guide

Shared definitions so a 4 means the same thing to everyone: 5-point likelihood and impact scales, rating bands, and a 5x5 risk matrix.

  • •Likelihood definitions 1 to 5
  • •Impact definitions 1 to 5
  • •Rating bands and color-coded matrix

Prefer to work in a document? The full register, scoring guide, and worked example are also available in Word format.

Download the .docx version

30 pre-loaded AI risks

You do not start from a blank sheet. Each starter risk comes with a real description, example controls, a suggested owner, and indicative scores. Editing a credible baseline is much faster than composing one from scratch.

Data leakage4Shadow AI4Vendor & third party4Model behavior4Agentic AI4Compliance4Intellectual property3People & process3
IDCategoryRiskInherent score
AI-DL-01Data leakageCustomer records pasted into public AI chatbots leave the corporate boundary and may be retained or used for training.16
AI-SA-01Shadow AIStaff adopt AI tools IT has never assessed; nobody knows what data flows into them.15
AI-AG-01Agentic AIAn autonomous agent acts beyond its intended scope: sending messages, changing records, executing transactions.15
AI-MB-03Model behaviorModel quality degrades through drift or silent vendor updates, and without a baseline nobody notices.9

Scores shown are indicative inherent scores for a typical mid-size organization with limited AI-specific controls. Re-score every risk against your own environment.

How to score and review

Every risk is scored twice: once before controls (inherent) and once after (residual). The spreadsheet does the math and the color coding; your team supplies the judgment.

1
Rate likelihood and impact from 1 to 5
Use the shared definitions on the Scoring Guide sheet so ratings mean the same thing across teams. The inherent score (likelihood x impact) calculates automatically.
2
Record controls and name an owner
List the technical, contractual, and procedural controls that reduce each risk, and assign one accountable control owner per row.
3
Re-score for residual risk
Rate likelihood and impact again assuming controls operate as intended. A residual score still in the red band needs more treatment or a formal, senior-level acceptance.
4
Set status and review dates
Track each risk as Open, Mitigating, Accepted, or Closed. Review red risks monthly, amber quarterly, and green annually, and re-score whenever a tool, vendor, or regulation changes.
Low1 to 5

Acceptable with routine monitoring. Review at the standard cadence.

Medium6 to 14

Actively mitigate. Assign an owner, agree on a treatment plan, and review at least quarterly.

High15 to 25

Escalate to leadership. Treat before further rollout; consider pausing the activity until controls land.